In the meantime, you can already see a lot of things on the New Campus construction site: on the aerial view on the bottom left, the data center is being built and further up, the walls of “Studio 1” are already standing. Above, where at the moment there is still a building to be demolished, will be the entrance area with the cantilevered canopy.

> back to the overview